COUNTRY: SPAIN
ISLAND: GRAN CANARIA
PROJECT PROMOTERS: CONSEJO INSULAR DE LA ENERGIA DE GRANCANARIA (CIEGC)
SECTOR: ENERGY COMMUNITY
PROJECT VALUE: 25,000,000 €
WHAT IS THE PROJECT ABOUT?
- The project’s objective is to create a favourable environment for the implementation of an industrial energy community in the Arinaga Industrial Park, in which energy is generated, stored and consumed locally (690 companies).
- One of the key points is the establishment of a local energy market. A model has to be identified in order to maximize the benefit of the community, while minimizing the risk of disagreements between members & encouraging the integration of new renewable systems.
- This pilot project can serve as a reference to determine the key aspects for the proper development of renewable energy communities in Spain.
HOW WILL THE EU ISLANDS FACILICY NESOI SUPPORT THE PROJECT?
- Definition of the required environmental permitting procedures
- Cost Benefit analysis and socio economic and environmental impact evaluation
- Risk analysis and identification of available mitigation strategies
- Assessment of existing procurement options (e.g. tender, PPP, etc.)
- Action plan and identification of project monitoring procedures
- Evaluation of key information for the deployment of renewable generation
- Load Flow and grid capacity studies, dynamic stability study with respect to contingencies
- Design of the technological architecture required for energy communities management
- Basic Blockchain PoC (Proof of Concept) from synthetic data for virtual markets
- Economic feasibility studies for the implementation of generation and storage systems
- Preparation of the project financing plan