FESOL - Feasibility study for energy storage and solar energy in Lipari

 

COUNTRY: ITALY

ISLAND: LIPARI

PROJECT PROMOTER: The Green Consulting Group S.r.l. (TGCG)

SECTORS: PV, Storage

PROJECT VALUE: 9,500,000 €

 

WHAT IS THE PROJECT ABOUT?

  • The project is a feasibility study for the replacement of the existing PV plant present in Lipari, which is in a deteriorating state, by a new solar PV plant including storage, management and control modulation system.
  • The aim is to achieve a high level of energy independence from fossil fuels for the entire island, thanks to the supply of clean energy for water desalination, public lighting and buildings power consumption.
  • The project should have a spillover effect on the entire Aeolian archipelago, and other Mediterranean islands, inspiring and urging them to implement similar solutions

HOW WILL THE EU ISLANDS FACILITY NESOI SUPPORT THE PROJECT?

  • Assessment of the key project sizing drivers
  • Identification of suitable technological options given existing project sizing requirements
  • Definition of the required environmental permitting procedures
  • Cost Benefit analysis and socio economic and environmental impact evaluation
  • Definition of the technical, economic and financial, fiscal project inputs
  • Risk analysis and identification of available mitigation strategies
  • Assessment of existing procurement options (e.g. tender, PPP, etc.)
  • Financial modelling and identification of target scenario
  • Identification of financing/funding options
  • Action plan and identification of project monitoring procedures
  • Preliminary legal and administrative due diligence

NESOI CONTACT

Andrea Martinez, SINLOC, andrea.martinez@sinloc.com

DOWNLOAD PROJECT BRIEF

(Image Source: Clemensfranz)

FESOL - Feasibility study for energy storage and solar energy in Lipari | NESOI

Error

The website encountered an unexpected error. Please try again later.