COUNTRY: GREECE
ISLAND: KYTHNOS
PROJECT PROMOTERS: PUBLIC POWER CORPORATION RENEWABLES SA (PPCR)
SECTOR: WIND, STORAGE
PROJECT VALUE: 1,750,000 €
WHAT IS THE PROJECT ABOUT?
- The proposed project includes the replacement of PPCR’s existing wind turbine with modern, state-of-the-art wind turbine and a ‘behind-the-meter’ lithium-ion battery.
- This innovative arrangement allows the full exploitation of the wind turbine’s installed capacity, using a large amount of energy that would under other circumstances be discarded.
- The project has high replicability as it applies to almost all the wind farms located on Greek islands that will need repowering soon.
- Kythnos has a long history of innovative energy projects since 1982 and the installation of Europe’s first wind farm
HOW WILL THE EU ISLANDS FACILICY NESOI SUPPORT THE PROJECT?
- Analysis of permitting procedures, proposed contractual framework, design options, technical documentation, workplan and cost assumptions
- Identification of existing litigations/appeals and evaluation of the associated risks
- Analysis of the soundness of the assumed economic and financial inputs
- Risk analysis and identification of available mitigation strategies
- Listing of condition precedents (CPs) for successive project implementation steps (e.g. tender adjudication, financial close and disbursement, start construction, etc.)
- Action plan and project identification of monitoring procedures